<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	
	>
<channel>
	<title>Comments on: Krugman on What Boeing&#8217;s Dreamliner Delays Teaches Us</title>
	<atom:link href="/2011/02/21/krugman-on-what-boeings-dreamliner-delays-teaches-us/feed/" rel="self" type="application/rss+xml" />
	<link>http://thesunbreak.com/2011/02/21/krugman-on-what-boeings-dreamliner-delays-teaches-us/</link>
	<description>Curious Georges in a conversation with Seattle</description>
	<lastBuildDate>Wed, 18 Feb 2015 07:17:37 +0000</lastBuildDate>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=4.2.2</generator>
	<item>
		<title>By: Losleben</title>
		<link>http://thesunbreak.com/2011/02/21/krugman-on-what-boeings-dreamliner-delays-teaches-us/#comment-3822</link>
		<dc:creator><![CDATA[Losleben]]></dc:creator>
		<pubDate>Thu, 24 Feb 2011 02:39:00 +0000</pubDate>
		<guid isPermaLink="false">/2011/02/21/krugman-on-what-boeings-dreamliner-delays-teaches-us#comment-3822</guid>
		<description><![CDATA[The Dreamliner is an R&amp;D airplane!! Out-sourcing has been going on for years. Mistakes were losing configuration  control. Drawings should have been done in house. Proper plannning and scheduling for an R&amp;D anything requires knowledge by the Scheduler (Industrial Engineer) not some manager sitting at a big table. The folks that did the schedule for the 787 were production people not R&amp;D Engineers. I know , I don&#039;t have to be there. I&#039;m a Boeing Retiree and proude of it!!!]]></description>
		<content:encoded><![CDATA[<p>The Dreamliner is an R&#038;D airplane!! Out-sourcing has been going on for years. Mistakes were losing configuration  control. Drawings should have been done in house. Proper plannning and scheduling for an R&#038;D anything requires knowledge by the Scheduler (Industrial Engineer) not some manager sitting at a big table. The folks that did the schedule for the 787 were production people not R&#038;D Engineers. I know , I don&#8217;t have to be there. I&#8217;m a Boeing Retiree and proude of it!!!</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: bilco</title>
		<link>http://thesunbreak.com/2011/02/21/krugman-on-what-boeings-dreamliner-delays-teaches-us/#comment-3821</link>
		<dc:creator><![CDATA[bilco]]></dc:creator>
		<pubDate>Wed, 23 Feb 2011 21:22:00 +0000</pubDate>
		<guid isPermaLink="false">/2011/02/21/krugman-on-what-boeings-dreamliner-delays-teaches-us#comment-3821</guid>
		<description><![CDATA[Come on, he knows it &#039;form experience&#039;]]></description>
		<content:encoded><![CDATA[<p>Come on, he knows it &#8216;form experience&#8217;</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Roger D. Parish</title>
		<link>http://thesunbreak.com/2011/02/21/krugman-on-what-boeings-dreamliner-delays-teaches-us/#comment-3820</link>
		<dc:creator><![CDATA[Roger D. Parish]]></dc:creator>
		<pubDate>Tue, 22 Feb 2011 13:26:00 +0000</pubDate>
		<guid isPermaLink="false">/2011/02/21/krugman-on-what-boeings-dreamliner-delays-teaches-us#comment-3820</guid>
		<description><![CDATA[I hope you look more closely at your blueprints than you did at the photo you linked: the negative was reversed when it was scanned!!]]></description>
		<content:encoded><![CDATA[<p>I hope you look more closely at your blueprints than you did at the photo you linked: the negative was reversed when it was scanned!!</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Lucky Balaraman</title>
		<link>http://thesunbreak.com/2011/02/21/krugman-on-what-boeings-dreamliner-delays-teaches-us/#comment-3819</link>
		<dc:creator><![CDATA[Lucky Balaraman]]></dc:creator>
		<pubDate>Tue, 22 Feb 2011 04:52:00 +0000</pubDate>
		<guid isPermaLink="false">/2011/02/21/krugman-on-what-boeings-dreamliner-delays-teaches-us#comment-3819</guid>
		<description><![CDATA[When I read the LA Times article, what comes too mind is that Boeing experienced a failure of senior management. Apparently that team had insufficient knowledge of outsourcing, which led them to depend on suppliers far more than they should have.&lt;br/&gt;&lt;br/&gt;I know form experience that is IS possible to put together very large transportation machines with a distributed team. We were one of three geographically dispersed teams that jointly designed crucial subsystems for one of the largest cruise ships ever built (&quot;Fantasia&quot;: 138,000 tons. The outsourcer committed large management resources to the project to coordinate suppliers, and the one-year exercise went off without a hitch.&lt;br/&gt;&lt;br/&gt;See the liner at  &lt;a href=&quot;http://bit.ly/fjVuYd&quot; rel=&quot;nofollow&quot;&gt;http://bit.ly/fjVuYd&lt;/a&gt;.&lt;br/&gt;&lt;br/&gt;Lucky Balaraman&lt;br/&gt;CEO&lt;br/&gt;TMG&lt;br/&gt;Providers of engineering, architectural and other services&lt;br/&gt;&lt;br/&gt;//////////////]]></description>
		<content:encoded><![CDATA[<p>When I read the LA Times article, what comes too mind is that Boeing experienced a failure of senior management. Apparently that team had insufficient knowledge of outsourcing, which led them to depend on suppliers far more than they should have.</p>
<p>I know form experience that is IS possible to put together very large transportation machines with a distributed team. We were one of three geographically dispersed teams that jointly designed crucial subsystems for one of the largest cruise ships ever built (&#8220;Fantasia&#8221;: 138,000 tons. The outsourcer committed large management resources to the project to coordinate suppliers, and the one-year exercise went off without a hitch.</p>
<p>See the liner at  <a href="http://bit.ly/fjVuYd" rel="nofollow">http://bit.ly/fjVuYd</a>.</p>
<p>Lucky Balaraman<br />CEO<br />TMG<br />Providers of engineering, architectural and other services</p>
<p>//////////////</p>
]]></content:encoded>
	</item>
</channel>
</rss>
